13Oct

Ramban to Banihal Tunnel Project PKG-1

Ramban to Banihal Tunnel Project PKG-1

Project

Detailed Design and Site Support Services , Including MEP” for Ramban to Banihal (Package-1) Four Lanning on NH 44 Project.

Client

Tata Project Ltd.

Services

• Detailed design Services for Civil works of Twin Tube Highway Tunnels 4240 m 300 m of Length:
• Finalization of Tunnel Alignment
• Design & Drawings of Tunnel Cross Sections, Portal Cuts, Portal Support System, NATM Support System of & final concrete linings of tunnels.
• Detailed Design services for MEP works of Tunnel

Copyright © 2017 Indus Consultrans pvt. ltd. All Rights Reserved