Pre Bid Engg Services

In Progress Tunnels

Ramban to Banihal Tunnel Project PKG-1

Detailed Design and Site Support Services, Including MEP” for Ramban to Banihal (Package-1) Four Lanning on NH-44 Project, from North Bound to South Bound.

Client

Tata Projects Ltd.

Services

• Design of Highway & Associated Structures. • Detailed Design Services for Civil Works of Twin Highway Tunnel 4240m 300m of Length: • Finalization of Tunnel Alignment • Design & Drawings of Tunnel Cross Sections, Portal Cuts, Portal Support System, NATM Support System of & Final Concrete Linings of Tunnels. • Detailed Design & Drawings of Tunnel including E&M • Design of Cross Passages & associated Works

Read More

Raipur –Vishakhapatnam Corridor PKG-OD7

Development of Six Lane Baraja Kandili Section of NH-130 CD Road from km 338.500 to km 342.500 under Raipur-Visakhapatnam Economic Corridor in the state of Odisha on Hybrid Annuity Mode.

Client

Dineshchandra R. Agarwal Infracon Pvt. Ltd.

Services

• Detailed design Services for Civil works of Twin Tube Highway Tunnels 3420 m & 580m of Length • Finalization of Tunnel Alignment & Geometric Design Plan & Profile of Tunnel. • Design & Drawings of Tunnel Cross Sections, Portal Cuts, Portal Support System, NATM Support System & final concrete linings. • Detailed Design services for MEP works of Tunnel. • Detailed Design of VOP and slip roads.

Read More

Mohammad Ganj and Satbahini Railway Tunnel Project

Consultancy services for detailed design & Drawing of tunnel between Mohammad Ganj and Satbahini stations in connection with construction of 3rd line between Sonnagar-Garhwa Road Section.

Client

Rail Vikas Nigam Limited

Services

• Detailed Design Consultancy (Tunnel alignment, Design of tunnel Portal) • Preparation Feasibility Study. • Tender Preparation. • Post Contract support for tunnel construction. • Preliminary Design.

Vadakanchery-Thrissur Tunnel (Kuthiran Tunnel)

Technical Due Diligence of Tunnel at Vadakanchery-Thrissur Section of NH-47 (New NH-544) (Design Chainage: Km. 246+900 to Km. 248+500) Expressway.

Client

Sekura Roads Pvt. Ltd.

Services

• Review of all design documents of Highway tunnels. • Review of Geotechnical Report and review the existing. • Geotechnical condition at site. • Review of the selection of tunnel profile • Slope protection condition analysis. • Tunnel drainage roadway drainage throughout the tunnel • Ventilation requirements • Lighting requirements • Traffic control requirements

Read More

Pir-Panjal Rail Tunnel

Technical Due Diligence of Pir-Panjal Rail Tunnel.

Client

Services

• Review of all design documents of Highway tunnels. • Review of Geotechnical Report and review the existing. • Geotechnical condition at site. • Review of the selection of tunnel profile • Slope protection condition analysis. • Tunnel drainage roadway drainage throughout the tunnel • Ventilation requirements • Lighting requirements Traffic control requirements

Read More

DESIGN OF DPR for Seven TUNNELS on PUNE EXPRESSWAY

Feasibility Study & DPR of Seven Tunnels at Pune Expressway

Client

AECOM INDIA

Services

• Feasibility & Detail Project Report of 7 Nos. of Tunnels.

Read More

Parwanoo-Solan Tunnel of Length 921m

Detailed Design of Four Lane Parwanoo-Solan Tunnel

Client

GR Infraprojects Ltd.

Services

• Detailed Design of Civil Works for 921m long two-lane tunnel. • Geological mapping of tunnel alignment area. • Finalization of Tunnel alignment area and associated portals. • Design of Tunnel cross section and portals. • Design of temporary support systems. • Design of final lining of the tunnel.

Read More

Kiratpur-Ner Chowk Tunnels

Detailed Engineering Design of Five Tunnels on Kiratpur-Ner Chowk in the State of Punjab & Himachal Pradesh

Client

IL&FS TRANSPORTATION NETWORK LTD, INDIA

Services

• Review of the available reports and drawings. • Geological mapping of the tunnel’s alignment (T2, T3, T4, T5) for a corridor of 100m around the centre line of alignment. • Establishment of the geotechnical investigations program. • Preliminary geological model of tunnels as per NATM classification. • Contribution to the highway alignment refinement. • On-site consultancy services.

Read More

Chennani-Nashari Road Tunnel of Length 9 Km.

Construction of 9.0 km highway tunnel and escape tunnels using NATM method at Jammu & Kashmir, India

Client

IL&FS TRANSPORTATION NETWORK LTD, INDIA

Services

• Advisory on all aspects of NATM. • Construction methodology & Scheduling. • Value Engineering. • Review of E & M design. • Resolving contractual issues.

Read More

Kathmandu-Terai/Madesh (KTM)

Preliminary Design and Drawings of the ~1300 m long Twin Tunnel Project for Kathmandu – Terai / Madhesh (KTM) Fast Track Project

Client

IL&FS TRANSPORTATION NETWORK LTD, INDIA

Services

• Geological Mapping of Tunnel Alignment and Tunnel Portals. • Preliminary Tunnel Design. • Preparation of Detailed BOQ’s. • Suggest Construction Methodology. • Design of Tunnel drainage works and diversion schemes.

Read More

Z-Morh-Tunnel (Srinagar Sonmarg-Gumri Road)

Pre-bid Technical Advisory Services for Z-Morh Tunnel including approaches and parallel escape tunnel on NH-1 on DBFOT basis.

Client

IL&FS TRANSPORTATION NETWORK LTD, INDIA

Services

• Review of reports technical data and drawings. • Review of geological model by field checks. • Review of rock classes as designed by preliminary Design Consultant of BRO. • Construction methodology & Scheduling. • BOQ Generation and rate analysis of major items. • E & M cost bench marking. • Preliminary Tunnel Design.

Read More

Zojila Tunnel of 2-lane Bi-Directional

Pre – Bid Engineering Services for work of Zojila Tunnel excluding approaches and parallel escape tunnel on Srinagar – Leh Section connecting NH – 1 on EPC mode.

Client

IRCON International Ltd.

Services

• Review of reports technical data and drawings of tender. • Review of geological model by field checks. • Review of rock classes as designed by preliminary Design Consultant of BRO. • Construction methodology & Scheduling. • BOQ Generation and rate analysis of major items. • E & M cost bench marking. • Preliminary Tunnel Design

Read More

16 Km long Zojila Tunnel (J&K)

  • 2 lane Bi-directional Tunnel on NH-1 in the state of J&K with parallel Egress tunnel , caverns and shafts . Involved 2.8 million Cum underground excavation and 50 cross passages and three deep shafts upto 480m depth.

Client

Reliance Infrastructure for NHIDCL

Khambataki Ghat Project

  • Proof Consultant Services For Khambatki Ghat Project

Client

Gayatri Projects Limited

Services

Review of Geotechnical interpretative Report (GIR), tunnel design basis report and inception report including alignment report.
Checking of tunnel temporary support design and drawing of tunnel and portals including construction sequence and permanent design and drawing & Design and drawing for tunnel.

Kaithlighat Tunnel 460 m long on NH-22 (Himachal Pradesh)

Client

IL&FS Transportation Network Limited for NHAI

6 Tunnels bridges and other works on Pandoh Takoli 4 lanning NH1 project (Himachal Pradesh)

  • Length ranging from 730 m to 4166m with aggregate length of 16811m

Client

APCO , IL&FS Transportation Network Limited &for NHAI

Raipur –Vishakhapatnam Corridor PKG-OD7

Detail design for development of six lane Baraja –Kandili section of NH130-CD road from Km. 338+500 to Km. 342+500 – Raipur-Vishakhapatnam Economics Corridor in the state of Odisha on hybrid annuity mode (Package OD-7.

Client

Dineshchandra R. Agrawal Infracon Pvt. Ltd.

Services

• Detailed design Services for Civil works of Twin Tube Highway Tunnels 3420 m & 580m of Length: • Finalization of Tunnel Alignment & Geometric Design Plan & Profile of Tunnel . • Design & Drawings of Tunnel Cross Sections, Portal Cuts, Portal Support System, NATM Support System & final concrete linings . • Detailed Design services for MEP works of Tunnel • Detailed Design of VOP and slip roads.

Detailed Design & Supervision of 921 m long 2- lane tunnels and allied works for 4 lanning of Parwanoo- Solan Section NH5 Km 67-106 in Himachal Pradesh.

Client

GR Infraprojects for NHAI

Read More

Completed Tunnels

Chennani Nashri Highway Tunnel (J&K)

  • 9 Km long Road tunnel ( 2 lane) with parallel escape tunnel using NATM.
  • Longest road tunnel in India.
  • Involved 2.0 million Cum underground excavation and 27 cross passages.

Client

IL&FS Transportation Network Limited for NHAI.

Services

Advisory on all aspects of NATM, Construction methodology, Scheduling & Value Engineering.

Read More

Nepal : Initial design of 1.3 km long twin tunnels

  • for KNP- Madhes Expressway

Client

IL&FS Transportation Network Limited for Govt of Nepal

Services

Geological mapping and preliminary deisgn , BOQ

Tunnels on Kiratpur Ner-Chowk Highway Project Himachal Pradesh

  • Four Laning of Kiratpur to Ner-Chowk Section of NH-21 from Km 73.200 to Km 186.500 involving 6 tunnels.

Client

IL&FS Transportation Network Limited for NHAI

Services

Geological Mapping, Preliminary design & BOQ of 5 tunnels length ranging form 400m to1800m ans Aggregate 6.7 km tunnelling.

Tunnels on Udhampur-Srinagar-Baramulla Railway projects ( J&K)

  • NATM tunnels and Bridges for Kashmir railway line. Bored tunnels i.e. T -77B & 77-C along with cut & Covers & Slope protection Works

Client

Bumi Geo Engineering for IRCON International Limited

Services

Project Management services

Kalanagar Mumbai: Grade separator – feasibility study for underpass tunnels.

  • Feasibility study for tunnel under-passages in c/w Grade separator using NATM and other options . 3 Underpasses two lane highway

Client

Mumbai Metropolitan Regional Authority ( MMRDA).